Closing the two certified within-half scale ledgers #
This file contains only the finite combinatorial bookkeeping needed to use the compatible analytic budgets. It identifies the all-Green initial scale product, bounds the number of processed blocks by their total perturbative order, and combines the two terminal scale products with the initial nested cross order.
The literal all-Green active scale product has one factor for each of
the m + 1 production-edge slots.
Every block in the analytic schedule has positive perturbative order, so the schedule length is no larger than its order sum.
A complete certified trace has processed exactly the order of the initial analytic suffix.
The number of processed blocks in a complete certified trace is no larger than the initial suffix order.
Closed form of one terminal scale product when its certified budget starts from the constant all-Green scale.
The two certified terminal scale products and the complete initial nested-cross inserted majorant are absorbed into one ambient-order inserted majorant. This is the exact three-schedule order ledger used after the endpoint/run integral estimate.